市值: $2.1169T -2.34%
成交额(24h): $82.6304B 15.78%
  • 市值: $2.1169T -2.34%
  • 成交额(24h): $82.6304B 15.78%
  • 恐惧与贪婪指数:
  • 市值: $2.1169T -2.34%
加密货币
话题
百科
资讯
加密话题
视频
热门新闻
加密货币
话题
百科
资讯
加密话题
视频
bitcoin
bitcoin

$61605.656648 USD

-3.04%

ethereum
ethereum

$1741.712974 USD

-3.34%

tether
tether

$0.999452 USD

0.06%

bnb
bnb

$569.840001 USD

-3.10%

usd-coin
usd-coin

$1.000291 USD

0.05%

xrp
xrp

$0.962638 USD

-1.69%

solana
solana

$72.392737 USD

-3.10%

tron
tron

$0.309467 USD

-1.00%

hyperliquid
hyperliquid

$65.780663 USD

-3.44%

zcash
zcash

$850.819478 USD

-9.16%

monero
monero

$479.362672 USD

-4.57%

dogecoin
dogecoin

$0.057347 USD

-3.31%

unus-sed-leo
unus-sed-leo

$9.228306 USD

-1.21%

chainlink
chainlink

$8.839656 USD

-3.37%

cardano
cardano

$0.149404 USD

-2.68%

加密货币新闻

Compass Mining Has Initiated Operations at the First Phase of Its Self-Owned Bitcoin Mining Facility in Iowa

2025/04/30 04:18

Compass Mining Has Initiated Operations at the First Phase of Its Self-Owned Bitcoin Mining Facility in Iowa

Compass Mining has begun operations at the first phase of its wholly-owned bitcoin mining facility in Iowa, the company announced on Tuesday.

The initial 8-megawatt (MW) phase of the 30 MW project has now commenced operations, while construction on the remaining capacity is set to begin in Q4 2025. Situated on a five-acre plot, the announcement shared with Bitcoin.com News reveals that the facility expands Compass Mining’s portfolio of self-operated infrastructure, permitting clients to deploy machines directly to the Iowa location.

The startup of the first phase comes after Compass announced in July that it had secured approval for a 30 MW bitcoin mining facility in Iowa. The facility will use clean energy sources, drawing around 18 MW from local utility company Northern Iowa Energy Cooperative. The facility will also use seven MW of solar energy credits from a third-party provider.

The announcement on Tuesday stated that the facility will house a total of 30 MW of bitcoin mining power, composed of 25 MW of direct MW capacity and five MW of solar energy credits.

Earlier this year, Compass Mining announced plans to build a hydro-cooled bitcoin mining site in North Dakota, which is now operational. The company also has a third-party hosting facility in Washington.

In 2024, Compass added nearly 50 MW of power capacity across six U.S. states, including Indiana, Ohio, and Texas. The firm’s expansions align with its strategy to grow self-owned infrastructure alongside partnerships with third-party hosting providers.

Earlier this year, Compass announced plans to build a hydro-cooled bitcoin mining site in North Dakota, which is now operational. The company also has a third-party hosting facility in Washington.

In 2024, Compass added nearly 50 MW of power capacity across six U.S. states, including Indiana, Ohio, and Texas. The firm’s expansions align with its strategy to grow self-owned infrastructure alongside partnerships with third-party hosting providers. The company did not disclose projected timelines for full completion of the Iowa facility or associated costs.

“Expanding our self-owned infrastructure is a crucial step in strengthening Compass Mining’s position as a leader in Bitcoin mining hosting,” said Paul Gosker, CEO of Compass Mining. Gosker, in a statement shared on Tuesday, added:

“Owning and operating our own sites gives customers greater operational control while still allowing them to choose from our network of reliable third-party facilities to best meet their individual needs and preferences.”

原文来源:bitcoin

免责声明:info@kdj.com

所提供的信息并非交易建议。根据本文提供的信息进行的任何投资,kdj.com不承担任何责任。加密货币具有高波动性,强烈建议您深入研究后,谨慎投资!

如您认为本网站上使用的内容侵犯了您的版权,请立即联系我们(info@kdj.com),我们将及时删除。

2026年11月20日 发表的其他文章